|

Poleline
The line crew at CRG Electric has a combined experience of
30 years. Our crews service oilfield distribution lines,
install new services and generally perform all services required
to keep power on for our customers. Below is a pictorial
representation of our line crew at work installing a new
transformer bank and distribution at a water flood tank battery.
New poles were set and new transformer bank installed. |
 |
 |
While the service was down we provided temporary power with a rental
generator. The new transformer bank going into place, out with the old and
in with the new. |
 |
 |
With everything in place, feeder disconnects are tied in on secondary. |

 |
Final line tap connected and power
is ready to be restored to equipment. |
 |
For more information, contact Steve Robinson
srobinson@crgelectric.com
|
[Top of Page]
|
Mailing Address: PO Box 69008, Odessa, Texas 79769-9008
Physical Address: 2056 N. FM 1936, Odessa, Texas 79769
US 1-800-725-2493 Fax 1-915-381-2724
24 Hour Service 1-915-381-2493
Copyright © CRG Electric, Inc. 2000
|